EG&R ENVIRONMENTAL SERVICES

( A Division of Universe Resources LLC)
HOME
ABOUT OUR FIRM
SERVICES
PROJECT EXPERIENCE
MANAGEMENT & KEY PERSONNEL
CLIENTS
CAREERS
LINKS
CONTACT US
PRESS RELEASES

Underground Storage Tanks

 

Underground Storage Tank (UST) closures, Site Investigations, and Remediation of former UST sites including the design of product recovery systems, and vapor intrusion inv estigations (over 100 sites- New Jersey, Pennsylvania, and New York)

 

Removal of 30 underground storage tanks and construction of two fuel dispensing facilities including site preparation, construction of retaining walls, fencing, curbs, and gates (City of Newark).

Remedial Investigations & Feasibility Studies

RI/FSs and Remediation of a number of Dense, Non-Aqueous Phase Liquid (DNAPL, such as many chlorinated organic compounds, coal tars, etc.)- contaminated sites. (Hoechst Celanese, Beezer Inc., BASF, Georgia Pacific, Ford Fasteners, various consulting firms)

Remedial Investigation/ Feasibility Studies (RI/FS)/ Remedial Alternatives Analysis of CERCLA, RCRA, ECRA/ISRA (New Jersey) and UST sites (Olin Chemicals, Kalama Chemical, BASF, ASARCO, Rockwell International, Schuylkill Metals, Cessna, Plessey Dynamic, Southland, Lenox, Novak, U.S. Postal Service, A.T.&T., various commercial clients and consulting firms).

RCRA Facility Investigations (RFI) and Corrective Measures studies (CMS). (Olin Chemicals, Chemical Waste Management, Texaco)

Investigation of groundwater contamination by nitrates and nitrate transport modeling at various septic facilities in southern New Jersey. Also provided hydrogeologic modeling support for the design of septic facilities. (School Districts and various engineering companies in New Jersey).

A-E Environmental Services/Remediation and Streambank Stabilization, Site #34, U.S. Naval Base, Kittery, E; U.S. Navy.

Characterization of a low-level radioactive waste disposal site in Arkansas (U of Ark). Reviewed site characterization plans (prepared by DOE’s Office of Civilian Radioactive Waste Management) for high-level radioactive waste repository siting, Deaf Smith County, Texas.

Hydrogeologic investigations and geochemical studies associated with landfills, mines, and smelters, and acid mine drainage problems. (Burlington Northern Rail Road, Alcoa, Leadville Mining, ASARCO, Waste Management Inc., St Joe Gold Corp., and various engineering companies).

Permitting & Compliance

Part B Hazardous Waste Permit Applications including various supporting documents and plans. Prepared solid waste permits applications and permit modifications. (Olin Chemicals, Marine Shale Corp., Chemical Waste Management, Rocky Flats Plant)

Preparation and implementation of closure plans for hazardous waste and solid waste facilities (Olin Chemicals, Georgia pacific, CECOS International).

Litigation-related projects, which involved evaluation of technical reports prepared by other consultants, identification of key hydrogeologic and groundwater contamination issues, preparation of

Preparation of numerous groundwater assessment and monitoring reports for RCRA regulated sites (Olin Chemicals, Georgia Pacific, CECOS International, Marine Shales Corp.).

Execution of corrective action for an abandoned hazardous waste landfill and drum- storage area (Olin Chemicals).

 

 Prepared and conducted peer reviews of Underground Injection Control (UIC) permits

Preparation of DPCC and SPCC Plans for chemical manufacturing and bulk fuel storage facilities. (Fidelity Chemical, Olin Chemicals, National Fuel Oil Inc., various engineering companies).

Air permits to install and certificates to operate for: surface coating, degreasing, non reactive blending for paint making, batch processes in resin and pharmaceutical industry, air pollution control equipment including thermal and catalytic oxidizer.  Projects were located in New Jersey, Pennsylvania, Texas, and Massachusetts.

A/E Environmental Services, Fort Monmouth U. S. Army Installation, USACE contract, New York District.

NPDES permitting, Pollution Prevention Plans, Stormwater Sampling and Facility inspections, U. S. Army, Fort Monmouth, NJ.

Environmental Assessments

Environmental audits including several Phase I and Phase II site assessments of commercial and industrial sites (Federal Aviation Authority, U.S. Postal Service, engineering companies, law firms, and commercial clients).

 

Environmental Assessment/ NEPA (Federal Aviation Authority/ U.S.Dept. of Transportation).

 

Human Health Risk Assessments

 

Risk assessments, clean up levels evaluations, risk-based corrective actions evaluations, and preparations of natural remediation demonstrations (Georgia Pacific, law firms and engineering companies).

 

Remediation/Remedial Design

Evaluation of groundwater remediation systems including pump and treat system and institutional treatment systems involving air sparging, bioremediation.  Design of groundwater pump and treatment system at industrial sites.  (BASF, Olin Chemicals, Beezer, Inc., UOP, Tuscon Dairy Farms, various commercial clients)

Engineering design, health and safety, and construction quality assurance for the construction of a hazardous waste landfill (Olin Chemicals).

Groundwater Modeling

 

Groundwater modeling/contaminant transport modeling using analytical, semi-analytical and numerical models (various clients).

Wetlands Studies

 

Wetlands delineations and permits preparation (Acres International and various commercial clients)

Laboratory Data Validation

Laboratory data validation of volatile, semi-volatile, and metals analyses (over 2000) using EPA Region II and Region III guidelines. Also performed data evaluations and prepared Quality Assurance Project Plans. (Various U. S. Navy Projects, CH2M Hill, EA Engineering, and various consulting companies)

 Litigation Support

Expert witness reports, and presentation of testimony at depositions. (Various law firms in New Jersey, Louisiana, and various consulting firms)

  Note: (The above listing also includes the individual experience of founders of the company)